Past Projects

A team you can trust.

GoldCorp – Arsenic Treatment System

LTL constructed a new 2 cell sludge lagoon complete with lagoon outlet structures and force main inlet piping.

Significant drilling and blasting operation including Hoe-ram work was required to prepared site for pipe installations. We also constructed a new 11m x 10m sheet pile pump platform system in tailing pond with 40 ft long sheet piles and dywidag tie rod system.

Arsenic Treatment System

Project Summary

Arsenic Treatment System

Client:
GoldCorp

Services Provided:

Backfilling
Excavation
Site Grading

View All Projects