GoldCorp – Arsenic Treatment System
LTL constructed a new 2 cell sludge lagoon complete with lagoon outlet structures and force main inlet piping.
Significant drilling and blasting operation including Hoe-ram work was required to prepared site for pipe installations. We also constructed a new 11m x 10m sheet pile pump platform system in tailing pond with 40 ft long sheet piles and dywidag tie rod system.
Project Summary
Arsenic Treatment System
Client:
GoldCorp
Services Provided:
Backfilling
Excavation
Site Grading