300mm Watermain on Manitoulin Island
LTL mobilized equipment and labour to Manitoulin Island for the installation of 3,000m of 300mm truck watermain for the community of Sucker Creek. The project involved removal of trench rock with LTL’s hydraulic rock hammer, open cut installation of watermains and service connections and the installation of the steel casing crossing the highway.