Raw Water Intake Line - Rocky Bay Reserve, MacDairmid Ontario

LTL supplied and installed a 300mm dia. * 205m long raw water intake line into Lake Nipigon. We installed a 7m deep Raw Water Intake Structure and Pumps located along shoclassine. The intake line was installed utilizing our Vermeer D50*100 Directional Drill.

The Raw Water Intake Structure was installed utilizing a system of sheet piles and whalers to depth well below lake level.

 

Gallery

  • Photo 1: Barge with tugboat and backhoe retrieving drill rod from 27' of water
  • Photo 2: Barge with excavator supporting product pipe
  • Photo 3: View of barge from shore
  • Photo 4: Wet well installation

Please click on the photos below for a larger view:

Click here for larger image. Click here for larger image. Click here for larger image. Click here for larger image.


Home     LTL Contracting     LTL Directional Drilling     Simco Equipment Rentals     LTL Subdivisions     LTL Environmental