800m Long Intake at Lake Helen, Ontario
LTL Directional Drilling supplied and installed a 300mm dia. * 800m long raw water intake line into Lake Helen using our Vermeer D50*100 Directional Drill. We also installed an 8m raw water intake structure and pumps along the shore of Lake Helen utilizing a system of sheet piles and whalers to a depth well below lake level.