LTL Directional Drilling has worked on many projects in Thunder Bay, and in the surrounding areas. Please click on the links below for full project details:
 | Lake Helen LTL supplies and installed a 300mm dia. * 800m long raw water intake line into Lake Helen. We installed an 8m raw water intake structure and pumps utilizing a system of sheet piles and whalers to depths well below lake level. View project |  | Kam River Crossing LTL installed a 750mm watermain across the Kaministiquia River at Highway 61. This project required 10 days of drilling, with pullback pressures reaching a maximum of 169,000 lbs through a sand seam. View project |
| | | | |
 | James St. River Crossing 500m of 600mm dia. HDPE was installed at the west of the James St. swing bridge across the Kam River. Depth of bore under the river banks approached 70ft. A wiclassine locating system was utilized to steer the drill head. View project |  | Gull Bay Water Treatment Plan LTL constructed a new water treatment plant in Gull Bay which included the installation of a new 250mm dia. raw water intake line with new wetwell and new water distribution piping with road upgrades. View project |
| | | | |
 | Keefer Terminal LTL installed a 300mm HDPE fire and domestic waterline for the new Keefer Terminal Cargo Shed. The project required several Railway crossings with a protective steel casing. Hydrants and valves were cut in to the waterline. View project |  | Utility Installations LTL specializes in utility installations, including telephone, cable and Hydro systems. We have considerable experience throughout Northwestern Ontario utilizing directional drilling methods. View project |
| | | | |