LTL Contracting Ltd. is pleased to provide a portfolio of recent projects we've worked on. With over 25 years of experience in the industry, our clients have come to classy on our expertise. Please click on the links below for full project details:

 

Vactor 2100

Vactor 2100

Featuring our Vactor 2100 Hydrovac trucks equipped with cold weather circulation, 1000-1500 gallon water tanks, telescoping and rotating hose reel, debris flush out system, hydraulic suction boom and a 9cu.m debris tank.

View project

Highway 61 Steel Casing

Highway 61 Steel Casing

LTL installed a 900mm dia. steel casing under Highway 61 in Thunder Bay. A 24" hammerhead pipe ram was utilized, powered by heavy duty compressors providing 1700 cfm. Another successful project!

View project

 

 

 
Ignace Water System Upgrades

Ignace Water System Upgrades

This project involved the installation of a 750mm dia. casing by pipe ramming under the CP Railway ROW in Ignace. The installation was approximately 63m long and proved to be a smooth project from start to finish.

View project

Fort Albany School Clean-up

Fort Albany School Clean-up

LTL Contracting Ltd. was successful in the design and clean-up of the old Ste. Anne School. The project consisted of designing and constructing containment cells at the landfill for asbestos waste and hydrocarbon contaminated soils.

View project

   
Gold Corp. Arsenic Treatment

Gold Corp. Arsenic Treatment

LTL constructed a new 2 cell sludge lagoon complete with lagoon outlet structures and forcemain inlet piping. Work performed included excavation, backfilling and site grading of new treatment plant.

View project

Sleeping Giant Provincial Park

Sleeping Giant Provincial Park

LTL constructed a new water treatment plant. The project included the construction of a new building with pre-cast reservoirs, a new water distribution system, well upgrades and a sewage system upgrade.

View project

 
Greenstone Pumping Station

Greenstone Pumping Station

LTL constructed a new sewage treatment plant and pumping station for the Municipality of Greenstone. A new 650m forcemain  was installed as well as a new Headworks building.

View project

Sucker Creek Trunk Watermain

Sucker Creek Trunk Watermain

LTL mobilized equipment and labour to Manitoulin Island for the installation of 3,000m of 300mm truck watermain. Work included the removal of trench rock, an open cut installation of watermains, etc.

View project

   
Rocky Bay Reserve

Rocky Bay Reserve

LTL supplied and installed a 300mm dia. and 205m long raw water intake line into Lake Nipigon. The structure was installed utilizing a system of sheet piles and whalers to depth well below lake level.

View project

Bowater Waterline

Bowater Waterline

LTL installed a new 300mm PVC C900 waste waterline pipe at Bowater. The pipe was ordered with a joint locking mechanism which prevents PVC pipe joints from pulling apart during pullback.

View project

   
Gull Bay Water Treatment Plan

Gull Bay Water Treatment Plan

LTL constructed a new water treatment plant in Gull Bay which included the installation of a new 250mm dia. raw water intake line with new wetwell and new water distribution piping with road upgrades.

View project

image

Keefer Terminal

LTL installed a 300mm HDPE fire and domestic waterline for the new Keefer Terminal Cargo Shed. The project required several Railway crossings with a protective steel casing. Hydrants and valves were cut in to the waterline.