Construction of New Sewage Treatment Plant and Pumping Station
LTL installed a new 650m forcemain from wetwell to new HWB. A new Headworks building complete with new mechanical and manual screens, vortex grit separator, aeration blowers, chlorination / dechlorination system and emergency generators was also constructed.
Installation of a new RAS/WAS pumping station was completed, as well as modifications to the existing circular treatment plant and the existing sewage life station. Finally, the existing 400m long effluent outfall was replaced.