Construction of New Sewage Treatment Plant and Pumping Station

LTL installed  a new 650m forcemain from wetwell to new HWB. A new Headworks building complete with new mechanical and manual screens, vortex grit separator, aeration blowers, chlorination / dechlorination system and emergency generators was also constructed.  

Installation of a new RAS/WAS pumping station was completed, as well as modifications to the  existing circular treatment plant and the existing sewage life station. Finally, the existing 400m long effluent outfall was replaced.

 

Gallery 1

Please click on a photo below for a larger view:

Click here for larger image. Click here for larger image. Click here for larger image.  


 

New Sewage Plant and Clarifier

 

Gallery 2

  • Left Photo: Blasting and excavation for new pre-package sewage treatment plant
  • Centre Photo: Finishing concrete pour for sewage plant base slab
  • Right Photo: Assembly of prepackage sewage plant; steel wall panels visible prior to painting and backfilling

 

Please click on the photos below for a larger view:

Click here for larger image. Click here for larger image. Click here for larger image.  


Home     LTL Contracting     LTL Directional Drilling     Simco Equipment Rentals     LTL Subdivisions     LTL Environmental