Kam River Crossing

Click here to view the printer friendly version.

750mm Watermain Crossing the Kaministiquia River at Hwy 61

LTL Directional Drilling supplied and installed 400m of 750mm dia. HDPE DR11 across the Kaministiquia River at Hwy 61. We utilized a Vermeer 15-*300 directional drill with a 6000 gal mud recycler and a 600gpm mud pump. This project required 10 days of consecutive drilling with pullback pressures reaching a maximum 169,000 lbs. through a sand seam. The final hole opened up with a 36" dia. fly-cutter reamer. The weight of the product pipe being installed was approximately 121,000 lbs.

 

Gallery 1

Please click on the photos below for a larger view: 

Click here for larger image. Click here for larger image. Click here for larger image. Click here for larger image.
       
Click here for larger image.
Home     LTL Contracting     LTL Directional Drilling     Simco Equipment Rentals     LTL Subdivisions     LTL Environmental