Gull Bay Water Treatment Plant

Click here to view the printer friendly version.

Raw Water Intake and Watermain Installation

LTL constructed a new Water Treatment Plant in Gull Bay with a project cost of $4.1 million.

Installations included:

  • New  250mm dia. Raw Water Intake Line with new Wetwell
  • New water distribution piping with road upgrades
  • Marine installation of backwash outfall from Water treatment plant

 